Thanks Rob,
It was a great night, and thanks again to yourself, Natalie and Grace.
I am allowed out sometimes haha. But to be honest I think that's my R/C season over already as I have far too many jobs on and not enough hours.
Currently have concrete to do for my bike in the back garden - about 6 tonnes worth of materials! But this is not until after the rewire as my mate is out due to a knee operation.
I am doing a full house rewire at the moment as well as other bits n pieces like stud walls etc. So a massive amount of work there, 40 odd socket boxes to sink into brick walls and chase all the cable runs, all ceiling are being pulled down downstairs. I then have to make good all that work which includes reinstating the entire kitchen, new floors and woodwork throughout, ceilings re boarded and ceilings/walls to plaster. Then decorate
I'm off to Newcastle this weekend, Dumfries next weekend.
I have a car to replace both front springs on Sunday/Monday morning.
I then have a garage to board the walls, create a ceiling and plaster.
Decking lights to fit
Kitchen and dining room to plaster
Possibly another kitchen ceiling to replace/plaster
And any other jobs I have missed or that come up, all while I work dayshift/nightshift.
Not to mention I work mostly on my own. So not too much planned Haha! Currently I have a waiting list off about 3 months Plastering seems to be popular just now so no doubt have a few more of those jobs soon
But we need to meet up sometime for a drink/curry mate.